Product Center

Super Purchasing for Aluminium Cladding Board - AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We depend on sturdy technical force and continually create sophisticated technologies to meet the demand of Aluminium Cladding Sheet Specification, Aluminium Cladding Work, Aluminium Composite Panel Installation, We warmly welcome friends from all walks of life to cooperate with us.
Super Purchasing for Aluminium Cladding Board - AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC Detail:

AUTOMATIC FR A2 CORE PRODUCTION LINE02
AUTOMATIC FR A2 CORE PRODUCTION LINE03

Machine Main Technical Data

1. Raw material
Environment protection FR non-organic powder&Special water miscible liquid Glue&Water: Mg(oh)2/Caco3/SiO2 and other non-organic powder ingredients as well as Special water miscible liquid glue and some percentage of water for the formula details.

Non-woven fabrics film: Width: 830~1,750mm
Thickness: 0.03~0.05mm
Coil weight: 40~60kg/coil

Remark: Firstly start with 4layers of non woven fabrics film and top for 2layers and bottom for 2layers, and 2layers of them will be recoiled after conveying the core to the oven and finally the remaining 2layers will stick to the core after melting.

FR A2 CORE PRODUCTION LINE1

2. Finished composite panel
Width: 800-1600mm.
Thickness: 2.0~5.0mm.
Production speed: 1200~2000mm/min(Normally for 1800mm/min).
Calculation based on: width of 1240mm*(3~4mm) (adjust as per product’s thickness); raw material/formula/production technique/operation skill can effect the production speed.

3. Production line cooling water requirement (recycling)
Q= 0.5-1.5M3/H; P=Normally for 0.7KG/CM2, (design for 0.5~2kg/cm2 ).
Input temp T1: ≤20℃,  ≥0.3Mpa, hardness: 5-8odH.
Mainly used for powder mixing and combination of the formula and water AC cooling recycling and machine front parts-cleaning and other small quantity of recoiler magnetic brake application.

FR A2 CORE PRODUCTION LINE2

4. Total energy consumption: (230/400V)/3 phase/50HZ.
Power Supply: Installed capacity for FRA2 class: 240kw (actual energy consumption around 145kw).
Electric cabinet working environment: temp & humidity  ≤35℃, ≤95%.
Gas supply: Totally for 6ovens and about 110M3/H for the gas requirement(LPG or LNG),averagely for 78M3/H.

AUTOMATIC FR A2 CORE PRODUCTION LINE034

5. Total Compress Air volume
Q=0.5~1m3/min P=0.6~0.8Mpa
Air Consumption: Screw Type of Air Compressor with ≥1m3 air storage tank and motor of≥ 11KW

AUTOMATIC FR A2 CORE PRODUCTION LINE04

6. Size of the unit
Length* width* height (m): 85m*9m*8.5m(Front platform of the machine for 8.5m )
Total weight (approximately): 90 tons
Factory size (reference)
Length * width (m): 100*16
Crane: lifting capacity 5 tons


Product detail pictures:

Super Purchasing for Aluminium Cladding Board - AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC detail pictures

Super Purchasing for Aluminium Cladding Board - AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC detail pictures

Super Purchasing for Aluminium Cladding Board - AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC detail pictures

Super Purchasing for Aluminium Cladding Board - AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC detail pictures


Related Product Guide:

We goal to understand excellent disfigurement from the manufacturing and supply the top support to domestic and abroad clients wholeheartedly for Super Purchasing for Aluminium Cladding Board - AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC , The product will supply to all over the world, such as: Niger, Paris, Swansea, Our products are exported worldwide. Our customers are always satisfied with our reliable quality, customer-oriented services and competitive prices. Our mission is "to continue to earn your loyalty by dedicating our efforts to the constant improvement of our items and services in order to ensure the satisfaction of our end-users, customers, employees, suppliers and the worldwide communities in which we cooperate".
  • The supplier abide the theory of "quality the basic, trust the first and management the advanced" so that they can ensure a reliable product quality and stable customers.
    5 Stars By Irene from Accra - 2017.09.09 10:18
    A nice supplier in this industry, after a detail and careful discussion, we reached a consensus agreement. Hope that we cooperate smoothly.
    5 Stars By Honorio from Mauritius - 2018.02.04 14:13
    Write your message here and send it to us