Product Center

AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

"Control the standard by the details, show the power by quality". Our business has strived to establish a highly efficient and stable team staff and explored an effective good quality regulate course of action for Acp 2 Mm, White Aluminium Panels, Aluminium Sheet Wall Panel, Honesty is our principle, professional operation is our work, service is our goal, and customers' satisfaction is our future!
AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC Detail:

AUTOMATIC FR A2 CORE PRODUCTION LINE02
AUTOMATIC FR A2 CORE PRODUCTION LINE03

Machine Main Technical Data

1. Raw material
Environment protection FR non-organic powder&Special water miscible liquid Glue&Water: Mg(oh)2/Caco3/SiO2 and other non-organic powder ingredients as well as Special water miscible liquid glue and some percentage of water for the formula details.

Non-woven fabrics film: Width: 830~1,750mm
Thickness: 0.03~0.05mm
Coil weight: 40~60kg/coil

Remark: Firstly start with 4layers of non woven fabrics film and top for 2layers and bottom for 2layers, and 2layers of them will be recoiled after conveying the core to the oven and finally the remaining 2layers will stick to the core after melting.

FR A2 CORE PRODUCTION LINE1

2. Finished composite panel
Width: 800-1600mm.
Thickness: 2.0~5.0mm.
Production speed: 1200~2000mm/min(Normally for 1800mm/min).
Calculation based on: width of 1240mm*(3~4mm) (adjust as per product’s thickness); raw material/formula/production technique/operation skill can effect the production speed.

3. Production line cooling water requirement (recycling)
Q= 0.5-1.5M3/H; P=Normally for 0.7KG/CM2, (design for 0.5~2kg/cm2 ).
Input temp T1: ≤20℃,  ≥0.3Mpa, hardness: 5-8odH.
Mainly used for powder mixing and combination of the formula and water AC cooling recycling and machine front parts-cleaning and other small quantity of recoiler magnetic brake application.

FR A2 CORE PRODUCTION LINE2

4. Total energy consumption: (230/400V)/3 phase/50HZ.
Power Supply: Installed capacity for FRA2 class: 240kw (actual energy consumption around 145kw).
Electric cabinet working environment: temp & humidity  ≤35℃, ≤95%.
Gas supply: Totally for 6ovens and about 110M3/H for the gas requirement(LPG or LNG),averagely for 78M3/H.

AUTOMATIC FR A2 CORE PRODUCTION LINE034

5. Total Compress Air volume
Q=0.5~1m3/min P=0.6~0.8Mpa
Air Consumption: Screw Type of Air Compressor with ≥1m3 air storage tank and motor of≥ 11KW

AUTOMATIC FR A2 CORE PRODUCTION LINE04

6. Size of the unit
Length* width* height (m): 85m*9m*8.5m(Front platform of the machine for 8.5m )
Total weight (approximately): 90 tons
Factory size (reference)
Length * width (m): 100*16
Crane: lifting capacity 5 tons


Product detail pictures:

AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC detail pictures

AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC detail pictures

AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC detail pictures

AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC detail pictures


Related Product Guide:

With reliable good quality system, great standing and perfect consumer support, the series of products and solutions produced by our organization are exported to quite a few countries and regions for AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC , The product will supply to all over the world, such as: London, Netherlands, Jersey, By continuous innovation, we will provide you with more valuable products and services, and also make a contribution for the development of the automobile industry at home and abroad. Both domestic and foreign merchants are strongly welcomed to join us to grow together.
  • It is really lucky to meet such a good supplier, this is our most satisfied cooperation, I think we will work again!
    5 Stars By Erin from Jordan - 2018.10.09 19:07
    With a positive attitude of "regard the market, regard the custom, regard the science", the company works actively to do research and development. Hope we have a future business relationships and achieving mutual success.
    5 Stars By Honorio from Barcelona - 2017.08.21 14:13
    Write your message here and send it to us